| 1 | Draw of the work project. |
| 2 | Read the project. |
| 3 | Production selecting suitable construction. |
| 4 | Manufacturing cascading, be able to plan work flow. |
| 5 | Material to be able to recognize and choose appropriate material. |
| 6 | To anticipate and solve potential problems during construction. |
| 7 | Select and use appropriate design elements of the connection. |
| 8 | Select the type of wood according to the impregnation material. |